{"id":988,"date":"2012-08-04T14:34:22","date_gmt":"2012-08-04T20:34:22","guid":{"rendered":"http:\/\/www.appleattic.net\/blog\/?p=988"},"modified":"2012-08-22T09:46:05","modified_gmt":"2012-08-22T15:46:05","slug":"an-answer-tomorrow","status":"publish","type":"post","link":"https:\/\/www.appleattic.net\/blog\/an-answer-tomorrow\/","title":{"rendered":"An answer tomorrow?"},"content":{"rendered":"<p>No answer to our offer yet. Seller has until 5:00 PM tomorrow (Sunday) to respond. In the mean time I did speak to a contractor about putting in a drive way.<\/p>\n<p>Holy smoke!<\/p>\n<p>$1,800.00 per day for equipment plus materials (culverts) that may be needed. 2 day minimum. Soooo we are looking right around 4 grand to just be able to drive onto the lot! (Not including the County&#8217;s drive way permit fee, of course.) This would not get us back to a home site or include any retaining walls or materials to build them.<\/p>\n<p>High end, for all the goodies including decorative retaining walls, $12 &#8211; $15K depending on where we would identify a building site.<\/p>\n<p>I am in the wrong business.<\/p>\n<p>Here is a plat map of the property. Look at lot 174 which is the lot we want. This type is known as a &#8216;flag lot&#8217; because the entrance to the lot looks like the pole of a flag.<\/p>\n<div id=\"attachment_991\" style=\"width: 272px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.appleattic.net\/blog\/wp-content\/uploads\/2012\/08\/Sanderling_a.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-991\" class=\"size-medium wp-image-991\" title=\"Sanderling lot plat\" src=\"http:\/\/www.appleattic.net\/blog\/wp-content\/uploads\/2012\/08\/Sanderling_a-262x300.jpg\" alt=\"\" width=\"262\" height=\"300\" srcset=\"https:\/\/www.appleattic.net\/blog\/wp-content\/uploads\/2012\/08\/Sanderling_a-262x300.jpg 262w, https:\/\/www.appleattic.net\/blog\/wp-content\/uploads\/2012\/08\/Sanderling_a-896x1024.jpg 896w, https:\/\/www.appleattic.net\/blog\/wp-content\/uploads\/2012\/08\/Sanderling_a.jpg 1476w\" sizes=\"auto, (max-width: 262px) 100vw, 262px\" \/><\/a><p id=\"caption-attachment-991\" class=\"wp-caption-text\">Our proposed lot is number 174. Click on this image to bring up a larger version.<\/p><\/div>\n<p>The drive would come off the road and make a left turn to get into the lot proper. It is this &#8216;pole&#8217; entrance that makes the driveway so long. Distance from the road to the corner where the lot opens up is about 190 feet. The &#8220;52.16&#8221; is the width of the access alley, which is part of the lot and not an easement. Park County requires a 15 foot wide drive at a minimum so there would be a buffer zone between this lot and lots to the left and right.<\/p>\n<p>The $4K I mentioned earlier would just get us the first 200 feet or so, from the road up to the first corner marker &#8211; the &#8220;pole&#8221; section of the lot. Depending on where we would site a house or shed the drive would have to be extended. I might be able to handle an extension with rental gear. A skid-steer loader (Bobcat) goes for about $265.00 per day. I have only 1 previous experience running a Bobcat but I think I could handle it.<\/p>\n<p>The problem is that the entrance has to cut through a couple small ridges and be lowered to the height of the road, requiring an excavation of around 6 feet below surface level. I am not sure I could do it with rental gear. I may take a long probing rod along the next time and see if I can determine if the ridges are decomposed granite with some rocks in them or if there is a ridge of underlying rock. If I find the first condition I may try punching in the drive myself. If the second, then hiring a contractor would be the only way to go.<\/p>\n<p>All of this is moot, of course, if the buyer rejects our offer. We will know tomorrow.<\/p>\n<p>That&#8217;s it for now. Thanks for looking in!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>No answer to our offer yet. Seller has until 5:00 PM tomorrow (Sunday) to respond. In the mean time I did speak to a contractor about putting in a drive way. Holy smoke! $1,800.00 per day for equipment plus materials (culverts) that may be needed. 2 day minimum. Soooo we are looking right around 4 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-988","post","type-post","status-publish","format-standard","hentry","category-general","post-preview"],"_links":{"self":[{"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/posts\/988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/comments?post=988"}],"version-history":[{"count":7,"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/posts\/988\/revisions"}],"predecessor-version":[{"id":1042,"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/posts\/988\/revisions\/1042"}],"wp:attachment":[{"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/media?parent=988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/categories?post=988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.appleattic.net\/blog\/wp-json\/wp\/v2\/tags?post=988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}