Events moved fast this past week, starting with an eye-popping $25K quote and ending with a $4K driveway. Peter began building the driveway on Wednesday. I went over yesterday (Thursday) to oversee the work and take some photos. Here is the work in progress:

Bobcat and excavator were used during construction.

Bobcat and excavator were used during construction.

Excavator tore through rock and dirt.

Excavator tore through rock and dirt.

Bobcat moved material up to corner pad.

Bobcat moved material up to corner pad.

Here is a short video clip of Peter using his Bobcat skid-steer loader:

WordPress plugin

Powered by Cincopa Media Platform for your website and Cincopa MediaSend for file transfer.

 Completed drive looks like this:

Finished drive entrance.

Finished drive entrance.

Midway up drive heading to the curve.

Midway up drive heading to the curve.

Parking pad at end of drive.

Parking pad at end of drive.

South Park view from parking pad.

South Park view from parking pad.

I’ll have more narrative in a later post, but for now we are glad to have the driveway in place!

That’s it for now. Thanks for looking in!

Pam’s two cents worth:

Jer neglected to mention he traveled over to Como yesterday in a raging Colorado Spring snowstorm — stopped by two semi accidents on the interstate before even getting to his turn-off near Frisco.  I’m glad I didn’t travel along on this trip, those driving conditions on the interstate make me nuts.

Low visibility and packed roads, Vail Pass.

Low visibility and packed roads, Vail Pass.

Up on Sanderling, apparently the location of the parking pad [on the curve of the current drive] appears to be one of the less windy spots on the lot, way less windy than the saddle where we had contemplated putting an eventual cabin.  Which could mean the driveway is as long as it’s ever going to be…time will tell.  We still need a rough track up to the saddle for clearing wood from the top potion of the lot.